Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWear Point Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Wear Point Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Wear Point Wind Farm (Wind , Active) Location in the UK : Wales, Milford Haven, Pembrokshire Type of installation: Wind on/offshore: on Turbines :4 Capacity : 10 MW Approx Date of 1st power generation: July 2014
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
In the battle against climate change, the Welsh Assembly Government (WAG) has set formal targets for renewable energy in Wales. By 2010, the target is 800 megawatts (MW) of electricity from onshore wind energy projects. As part of this plan, Infinergy has investigated land on the northern edge of the Milford Haven waterway in Pembrokeshire near Waterston as a possible wind farm site.
On 25 May 2010 Pembrokeshire County Council granted planning permission for the project, following their Planning Officer's recommendation for approval. The aim is to have the wind farm operational in 2012. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Waterston Road Dyfed Milford Haven SA73 1DR Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Wear Point 8.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Dyfed Country: Wales LPA: Pembrokeshire County Council
|
Site ID and Reference: |
4661 / A0279
District:
|
Applicant: |
John Laing Environmental Assets Group
Application :
09/0544/PA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
8.2 |
Site Address: |
Land at Wear Point, Waterston Industrial, Llanstadwell
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
193041 / 193041
|
Development Status: |
Operational
|
Application Submitted: |
10/2/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/30/2012
|
|
|
Generator Live |
7/7/2014
|
This Record Last Updated: |
5/29/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Wear Point Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00198RQWA
|
Capacity: |
8135
|
Status: |
Live
|
Accreditation Date: |
10/2/2009
|
|
|
Commission Date: |
5/15/2014
|
|
|
Applicant: |
John Laing Investments
|
Applicant Address: |
1 Kingsway
London
WC2B 6AN
England
|
Address: |
Waterston Road
Dyfed
Milford Haven
SA73 1DR
Wales
|
Site Name: |
Wear Point Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01469NWWA
|
Capacity: |
8135
|
Status: |
Live
|
Accreditation Date: |
10/2/2009
|
|
|
Commission Date: |
5/15/2014
|
|
|
Applicant: |
John Laing Investments
|
Applicant Address: |
1 Kingsway
London
WC2B 6AN
England
|
Address: |
Waterston Road
Dyfed
Milford Haven
SA73 1DR
Wales
|
|
Assumptions: Capacity: 8135kW 8.135 MW, Thus over the month Capacity * 720 hours per month = 5857.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1934 | 23.77% | Issued | 01/03/2018 | | | 2350 | 28.89% | Issued | 01/02/2018 | | | 2396 | 29.45% | Issued | 01/01/2018 | | | 3406 | 41.87% | Issued | 01/12/2017 | | | 2608 | 32.06% | Issued | 01/11/2017 | | | 2178 | 26.77% | Issued | 01/10/2017 | | | 2707 | 33.28% | Retired | 01/09/2017 | | | 2245 | 27.60% | Retired | 01/08/2017 | | | 1704 | 20.95% | Issued | 01/07/2017 | | | 1413 | 17.37% | Issued | 01/06/2017 | | | 2075 | 25.51% | Retired | 01/05/2017 | | | 1419 | 17.44% | Issued | 01/04/2017 | | | 1130 | 13.89% | Issued | 01/03/2017 | | | 2478 | 30.46% | Issued | 01/02/2017 | | | 2441 | 30.01% | Issued | 01/01/2017 | | | 2011 | 24.72% | Issued | Dec-16 | 0 | 1853 | 2058 | 25.30% | Issued | Nov-16 | 0 | 1627 | 1807 | 22.21% | Issued | Oct-16 | 0 | 1502 | 1669 | 20.52% | Issued | Sep-16 | 0 | 2108 | 2343 | 28.80% | Issued | Aug-16 | 0 | 1692 | 1880 | 23.11% | Pending Tr | Jul-16 | 0 | 1435 | 1595 | 19.61% | Pending Tr | Jul-16 | 0 | 1435 | 1595 | 19.61% | Pending Tr | Jun-16 | 0 | 932 | 1041 | 12.80% | Pending Tr | May-16 | 0 | 1230 | 1366 | 16.79% | Pending Tr | Apr-16 | 0 | 1530 | 1700 | 20.90% | Pending Tr | Mar-16 | 0 | 1675 | 1861 | 22.88% | Redeemed | Feb-16 | 0 | 2417 | 2685 | 33.01% | Redeemed | Dec-15 | 0 | 4083 | 4537 | 55.77% | Redeemed | Nov-15 | 0 | 3057 | 3396 | 41.75% | Redeemed | Oct-15 | 0 | 1431 | 1589 | 19.53% | Redeemed | Sep-15 | 0 | 1256 | 1396 | 17.16% | Redeemed | Aug-15 | 0 | 1628 | 1809 | 22.24% | Redeemed | Jul-15 | 2140 | 1926 | 2140 | 26.31% | Redeemed | Jun-15 | 1552 | 1397 | 1553 | 19.09% | Redeemed | May-15 | 2371 | 2134 | 2027 | 24.92% | Redeemed | Apr-15 | 1539 | 1385 | 1538 | 18.91% | Redeemed | Mar-15 | 2392 | 2153 | 2392 | 29.40% | Expired | Feb-15 | 1893 | 1704 | 1893 | 23.27% | Redeemed | Jan-15 | 3345 | 3010 | 3345 | 41.12% | Redeemed | Dec-14 | 3165 | 2848 | 3165 | 38.91% | Redeemed | Nov-14 | 2182 | 1964 | 2182 | 26.82% | Redeemed | Oct-14 | 3127 | 2815 | 3128 | 38.45% | Redeemed | Sep-14 | 694 | 619 | 693 | 8.52% | Redeemed | Aug-14 | 1750 | 1576 | 1751 | 21.52% | Redeemed | Jul-14 | 800 | 715 | 800 | 9.83% | Redeemed | Jun-14 | 918 | 826 | 917 | 11.27% | Redeemed | May-14 | 165 | 145 | 166 | 2.04% | Redeemed |
|
Capacity: 20 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/16/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|